Virtual inspections for solar contractors

The inspection is usually the longest delay in a solar install. Same-day results mean PTO paperwork starts the day the panels go up.

~7 min
Recording time
10
Checklist items
<30 min
Review turnaround
Electrical Components6 items
Panel, conduit, grounding
⏱ 5 min recording✓ Guided prompts
Structural / Mounting4 items
Racking, flashing, anchors
⏱ 3 min recording✓ Guided prompts
SOLAR ELECTRICAL
6-step guided inspection
Progress
3/6
Conduit runs
Support spacing verified
Conductor sizing
Color coded per NEC
Grounding electrode
Connected to rods
4
Bonding jumpers
Metallic paths verified
5
Inverter listing
UL label + suitability
6
GFCI protection
Installed where required
Recording 2:34Step 4: Show bonding jumpers installed across metallic paths

Inspections we cover

Panel installations, racking and mounting, electrical connections, grounding and bonding, inverter installation, and labeling compliance. One guided video covers everything the inspector needs to see.

Why solar contractors care about speed

Your customer signed up for solar because of the savings. Every day between installation and PTO is a day they are not generating power and not seeing those savings. Some jurisdictions take 5-14 days just to schedule the inspection. Virtual gets it done the same day.

Interconnection timeline

PTO cannot start until the inspection passes. Same-day inspection means same-day PTO submission. That can shave a week or more off the timeline your customer experiences.

What inspection delays cost solar contractors

8 installs/week · 4-day avg wait · $75/hr crew cost

32
Open permits at any time
35
Inspections waiting/month
$5K+
Monthly delay cost
These are default estimates. Run your own numbers →

Ready to get started?

Book a call to see how virtual inspections can keep your jobs moving.

Book a Call

Close permits the same day the work is done