Virtual inspections for pool contractors

Pool builds are sequential. Every delayed inspection pushes the entire project. Virtual inspections keep each stage moving.

~5 min
Recording time
4
Items per stage
<30 min
Review turnaround
Perimeter Piping4 items
Return, suction, pressure
⏱ 4 min recording✓ Guided prompts
Underground Electric3 items
Conduit, bonding, depth
⏱ 3 min recording✓ Guided prompts
Bonding / Light Niche3 items
Equipotential grid
⏱ 3 min recording✓ Guided prompts
Final Pool Electric3 items
Equipment + GFCI
⏱ 3 min recording✓ Guided prompts
PERIMETER PIPING
4-step guided inspection
Progress
2/4
Piping layout
Return, suction, perimeter
Material + joints
Depth + secure connections
3
Pressure test
Pressurized, no leaks
4
Bonding separation
Clear of electrical
Recording 2:34Step 3: Demonstrate system is pressurized and holding without leaks

Inspections we cover

Steel / Rebar

Before gunite. Your tech captures the rebar layout, spacing, tie-downs, and dimensions against the approved plan. This has to pass before the gunite crew can pour.

Plumbing

Pool plumbing rough-in before the deck is poured. Documents pipe routing, connections, test caps, and equipment pad prep.

Barrier / Safety

Fence, screen, or barrier inspection. Gate latches, height, gap measurements, and self-closing hardware verification.

Bonding and Grounding

Electrical bonding grid, equipotential bonding, and grounding connections documented before they get covered.

Final

Complete pool with all equipment operational. Pump, filter, heater, lights, and safety features all verified.

Why the cascade matters

A 5-day wait on steel means the gunite crew reschedules. That pushes tile. That pushes the deck pour. That pushes barrier. One delayed inspection can add 2-3 weeks to the total build. Same-day results at each stage keep the whole sequence on track.

Guides for your trade

What inspection delays cost pool builders

6 builds/week · 5 stages each · 4-day avg wait · $85/hr crew cost

120
Open permits at any time
130
Inspections waiting/month
$22K+
Monthly delay cost
These are default estimates. Run your own numbers →
class="cta-s mt-48">

Ready to get started?

Book a call to see how virtual inspections can keep your jobs moving.

Book a Call

Close permits the same day the work is done

Book a 15-min call