Virtual inspections for roofing contractors

Roofing has a two-stage inspection sequence. Each wait compounds the next. Virtual inspections break the cycle.

Same day
Inspection result
<30 min
Average review time
All 67
Florida counties covered
Roof Dry-In
Underlayment on, before roof covering
Guided promptsPass criteria published
Roof Sheathing / Truss
Sheathing and trusses, before dry-in
Guided promptsPass criteria published
Roof Final
Covering and flashing complete
Guided promptsPass criteria published
INSP-1022 · Roof Dry-In
What your tech sees on site
Ready for inspection
Show roof deck fully covered with underlayment.
Visual · Deck fully covered, no exposed sheathing
Verify overlaps, fastener spacing, and sealing at penetrations.
Visual · Laps and fastening per FPA; penetrations sealed
3
Show flashings at valleys, vents, and drip edges.
Visual · Valley, vent, and drip-edge flashings installed and lapped
4
Confirm roof is watertight with no tears or exposed deck areas.
Visual · Watertight with no tears or exposed deck
Recording 2:34Next: Show flashings at valleys, vents, and drip edges.

Inspections we cover

Mid-Roof (Dry-In)

After tear-off and before finish material. Your crew captures the deck condition, underlayment installation, flashing details, drip edge, and any penetration treatments. This has to pass before shingles or tile go on.

Final Roof

After material installation is complete. Documents the finished surface, ridge detail, flashing terminations, penetration boots, and edge metal. This closes the permit.

Why the two-stage delay kills roofers

With the county, you tear off Monday, wait until Thursday for mid-roof, then install Friday, and wait until the following Wednesday for final. That is 9 days for a job that takes 2 days of actual work. With virtual inspections, you tear off Monday morning, get mid-roof approved Monday afternoon, install Tuesday, and close the permit Tuesday evening.

Post-hurricane demand

After a major storm, building departments get buried. Virtual inspections operate independently. Your capacity scales with your crew, not with the county's inspector availability.

What inspection delays cost roofing contractors

10 jobs/week · 2 inspections each · 4-day avg wait

80
Open permits at any time
87
Inspections waiting/month
$12K+
Monthly delay cost
These are default estimates. Run your own numbers →

Ready to get started?

Tell us about your trade and volume, and we'll get you set up on your first inspection.

Tell us about your business

Close permits the same day the work is done

Tell us about your business