Virtual inspections for pool contractors

Pool builds are sequential. Every delayed inspection pushes the entire project. Virtual inspections keep each stage moving.

Same day
Inspection result
<30 min
Average review time
All 67
Florida counties covered
Steel / Main Drain, Pool/Spa
Rebar grid and main drain, before gunite
Guided promptsPass criteria published
Pool Barrier
Barrier installed, before final
Guided promptsPass criteria published
Bonding, Pool Deck
Equipotential bonding loop, before deck pour
Guided promptsPass criteria published
INSP-1014 · Pool Barrier
What your tech sees on site
Ready for inspection
Show the full pool barrier enclosing the pool area.
Visual · Continuous barrier fully encloses the pool
Show barrier height and bottom clearance.
Visual · Height ≥48 in.; bottom clearance ≤2 in. (≤1.75 in. where required)
3
Show all openings, gaps, and climbable areas.
Visual · No 4-in. sphere passes; no climbable horizontal members. Gate(s) and barrier do not have any opening greater than 1/2" within 18" of the release mechanism
4
Show gate operation from both sides.
Functional · Gate self-closes and self-latches from any open position. Gate(s) must open outward away from the pool
The guided checklist continues from here
Recording 2:34Next: Show all openings, gaps, and climbable areas.

Inspections we cover

Steel / Rebar

Before gunite. Your tech captures the rebar layout, spacing, tie-downs, and dimensions against the approved plan. This has to pass before the gunite crew can pour.

Plumbing

Pool plumbing rough-in before the deck is poured. Documents pipe routing, connections, test caps, and equipment pad prep.

Barrier / Safety

Fence, screen, or barrier inspection. Gate latches, height, gap measurements, and self-closing hardware verification.

Bonding and Grounding

Electrical bonding grid, equipotential bonding, and grounding connections documented before they get covered.

Final

Complete pool with all equipment operational. Pump, filter, heater, lights, and safety features all verified.

Why the cascade matters

A 5-day wait on steel means the gunite crew reschedules. That pushes tile. That pushes the deck pour. That pushes barrier. One delayed inspection can add 2-3 weeks to the total build. Same-day results at each stage keep the whole sequence on track.

What inspection delays cost pool builders

6 builds/week · 5 stages each · 4-day avg wait · $85/hr crew cost

120
Open permits at any time
130
Inspections waiting/month
$22K+
Monthly delay cost
These are default estimates. Run your own numbers →

Ready to get started?

Tell us about your trade and volume, and we'll get you set up on your first inspection.

Tell us about your business

Close permits the same day the work is done

Tell us about your business