Pool builds are sequential. Every delayed inspection pushes the entire project. Virtual inspections keep each stage moving.
Before gunite. Your tech captures the rebar layout, spacing, tie-downs, and dimensions against the approved plan. This has to pass before the gunite crew can pour.
Pool plumbing rough-in before the deck is poured. Documents pipe routing, connections, test caps, and equipment pad prep.
Fence, screen, or barrier inspection. Gate latches, height, gap measurements, and self-closing hardware verification.
Electrical bonding grid, equipotential bonding, and grounding connections documented before they get covered.
Complete pool with all equipment operational. Pump, filter, heater, lights, and safety features all verified.
A 5-day wait on steel means the gunite crew reschedules. That pushes tile. That pushes the deck pour. That pushes barrier. One delayed inspection can add 2-3 weeks to the total build. Same-day results at each stage keep the whole sequence on track.
6 builds/week · 5 stages each · 4-day avg wait · $85/hr crew cost
Book a call to see how virtual inspections can keep your jobs moving.