Home/For Contractors/Plumbing

Virtual inspections for plumbing contractors

Water heater replacements, re-pipes, and rough-ins. High-volume trades where inspection delays stack up fast.

Same day
Inspection result
<30 min
Average review time
All 67
Florida counties covered
Plumbing, Top Out
Water, waste, and vent, before cover
Guided promptsPass criteria published
Final, Plumbing
Fixtures complete, ready for final
Guided promptsPass criteria published
Shower Pan / Tubs
Pan or tub set, before the water test
Guided promptsPass criteria published
INSP-1043 · Plumbing, Top Out
What your tech sees on site
Ready for inspection
Show vertical stacks, vent terminations, and branch lines.
Visual · Stacks, vents, and branches per plan
Confirm slope and alignment of waste piping.
Visual · Waste piping sloped and aligned per code
3
Verify water supply lines routed correctly and properly supported.
Visual · Supply lines routed and supported per code
4
Show pressure gauges or filled lines demonstrating no leaks.
Functional · System holds test/water with no leaks
The guided checklist continues from here
Recording 2:34Next: Verify water supply lines routed correctly and properly supported.

Inspections we cover

Rough-in, water heater replacements, re-pipe, and final inspections. Each has a specific checklist for what needs to be visible and documented.

Water Heater Replacement

The simplest virtual inspection. Unit specs, T&P discharge routing, strapping or anchoring, drain pan, venting or electrical connections, and clearances. Your tech records a 3-minute video and the permit closes.

Rough-In

Pipe material, sizing, support intervals, venting, cleanouts, and test results. Needs to be inspected before walls or concrete cover the work.

Re-Pipe

Full system replacement documentation. Material specs, routing, connections, pressure test evidence, and fixture terminations.

High-volume math

If you do 15 water heater replacements a week and each one waits 3-5 days for county inspection, you always have 45-75 open permits at any given time. Virtual closes them the same day.

What inspection delays cost plumbing contractors

12 jobs/week · rough + final · 4-day avg wait

96
Open permits at any time
104
Inspections waiting/month
$15K+
Monthly delay cost
These are default estimates. Run your own numbers →

Ready to get started?

Tell us about your trade and volume, and we'll get you set up on your first inspection.

Tell us about your business

Close permits the same day the work is done

Tell us about your business