Virtual inspections for HVAC contractors

AC changeouts are the highest-volume virtual inspection in Florida. Your tech finishes the install, records a guided video, and the permit closes the same day.

~5 min
Recording time
12
Checklist items
<30 min
Review turnaround
Final Mechanical12 items
Complete system verification
⏱ 5 min recording✓ Guided prompts
Start-Up9 items
Equipment commissioning
⏱ 4 min recording✓ Guided prompts
Rough Mechanical10 items
Before concealment
⏱ 6 min recording✓ Guided prompts
Slab Mechanical9 items
Sleeves and penetrations
⏱ 4 min recording✓ Guided prompts
FINAL MECHANICAL
12-step guided inspection
Progress
5/12
Site identification
House number + structure view
Equipment nameplates
Indoor + outdoor units
Permit match
Model, serial vs permit docs
System demo
Heating + cooling modes
Supply/return temps
Temperature verification
6
Condensate routing
Slope + discharge point
7
Secondary drain
Protection verified
8
Ductwork
Sealed, insulated, supported
9
Disconnect
Breaker labeling verified
10
Conductor sizing
Whip condition checked
11
Bonding + grounding
Connections verified
12
Attic insulation
R-value + access
Recording 2:34Step 6: Show condensate line routing, slope, and discharge point

Inspections we cover

AC changeouts, new system installations, ductwork inspections, and mechanical finals. Each one has a trade-specific checklist that walks your tech through exactly what to capture.

AC Changeout

The most common inspection we handle. Your tech records the equipment set (model, serial, capacity matching permit), clearances, condensate routing, disconnect, electrical connections, refrigerant line insulation, thermostat location, and plenum connections. Takes about 4 minutes to record.

New System Installation

Everything in a changeout plus ductwork installation, return air sizing, supply register locations, and energy code compliance documentation.

Ductwork

Material and sizing, support intervals, sealing, insulation R-value, and clearances from heat sources. Best captured before drywall goes up.

Emergency Replacements

FL 553.791 Section 10 waives the NTBO for emergency work. Your tech can inspect the same day the system goes in, and the report gets filed within one business day.

Why HVAC contractors switch to virtual

If you run 15 or more changeouts a week, you know the math. A 3-5 day inspection wait on each one means you always have dozens of open permits. Virtual inspections close them the same day the work is done.

Guides for your trade

What inspection delays cost HVAC contractors

15 jobs/week · 4-day avg wait · $75/hr crew cost

60
Open permits at any time
65
Inspections waiting/month
$10K+
Monthly delay cost
These are default estimates. Run your own numbers →
class="cta-s mt-48">

Ready to get started?

Book a call to see how virtual inspections can keep your jobs moving.

Book a Call

Close permits the same day the work is done

Book a 15-min call