Virtual inspections for EV charger installations

EV charger installations are one of the fastest-growing electrical trades in Florida. Standard electrical checkpoints, all visually verifiable.

~4 min
Recording time
6
Checklist items
<30 min
Review turnaround
Electrical Final6 items
Dedicated circuit + charger
⏱ 4 min recording✓ Guided prompts
EV CHARGER FINAL
6-step guided inspection
Progress
3/6
Panel + labeling
Service equipment shown
Dedicated circuit
Conductor sizing verified
GFCI protection
Installed per code
4
Charger mounting
UL/ETL label visible
5
Grounding
Electrode connections
6
Operation demo
Charger functional
Recording 2:34Step 4: Show charger mounting and UL/ETL listing label

What gets inspected

Service capacity verification, dedicated circuit, breaker sizing, wire gauge, charger mounting, GFCI protection, grounding and bonding, and labeling. These are standard electrical inspection points that translate cleanly to guided video capture.

Growing demand

Florida EV registrations are climbing year over year. Home charger installations follow. Electrical contractors adding EV charger work to their services can use virtual inspections to close these permits without adding to their county inspection queue.

What inspection delays cost EV charger installers

8 installs/week · 4-day avg wait · $75/hr crew cost

32
Open permits at any time
35
Inspections waiting/month
$5K+
Monthly delay cost
These are default estimates. Run your own numbers →

Ready to get started?

Book a call to see how virtual inspections can keep your jobs moving.

Book a Call

Close permits the same day the work is done

Book a 15-min call