Same day
Inspection result
<30 min
Average review time
All 67
Florida counties covered
EV Charger - Rough
Charger circuit, before concealment
Guided promptsPass criteria published
EV Charger - Final
Charger installed, ready for final
Guided promptsPass criteria published
INSP-1090 · EV Charger - Final
What your tech sees on site
Ready for inspection
✓
Show the charger mounted per the manufacturer's instructions.
Visual · Charger mounted per manufacturer
✓
Show the disconnecting means where required and the breaker labeling.
Visual · Disconnect (where required) and breaker labeled
3
Verify GFCI or GFPE protection where required.
Functional · Required GFCI/GFPE protection present and trips
4
Demonstrate the charger powers up and shows status indication.
Functional · Charger powers up with status indication
The guided checklist continues from here
Recording 2:34Next: Verify GFCI or GFPE protection where required.
What gets inspected
Service capacity verification, dedicated circuit, breaker sizing, wire gauge, charger mounting, GFCI protection, grounding and bonding, and labeling. These are standard electrical inspection points that translate cleanly to guided video capture.
Growing demand
Florida EV registrations are climbing year over year. Home charger installations follow. Electrical contractors adding EV charger work to their services can use virtual inspections to close these permits without adding to their county inspection queue.
What inspection delays cost EV charger installers
8 installs/week · 4-day avg wait · $75/hr crew cost
32
Open permits at any time
35
Inspections waiting/month
Ready to get started?
Tell us about your trade and volume, and we'll get you set up on your first inspection.