A straightforward comparison of the two inspection paths.
Florida contractors have two paths: municipal building department or private provider.
Building dept: 3-10+ business days. Private provider (virtual): Same day.
→ See our full comparison details
Building dept: Included in permit fees. Private provider: Provider fee, but FL 553.791 requires permit fee reductions. Often roughly neutral.
Identical. FL 553.791 gives both the same legal weight.
Private provider virtual: single-trade, high-volume, repeatable. Municipal: threshold buildings or complex multi-trade projects.
Book a call to see how virtual inspections can keep your jobs moving.
Book a CallClose permits the same day the work is done
Book a 15-min call